What was the project?

An ambitious, contemporary office and call centre fitout for a large telecoms company.

Where was it?

Fareham, Hampshire

What did we do?

This was a fast-turnaround, highly complex design and build project.
To make sure we delivered within the tight timescales, at any one time we could have up to nine engineers on site.
Our focus was on the lighting which was really integral to the whole look and feel of the office. We designed their electrical system and installed specialist programmable lighting and high quality light fittings.
We also worked on the power and, as part of that, we introduced sub-distribution boards on each level to localise the power supply and sources

Project in numbers

Installed lighting and power across 26,000 sq ft office space
Used 120,000 metres of data cabling

How long did it take?

Took just 8 months to complete.